Hotel Air Conditioning installation in London
This project of installing air conditioning within 135 hotel rooms was completed in 2020 at a hotel in london.
Working for an M&E contractor we undertook the of installation of a (Mitsubishi electric) heat recovery System on each floor, consisting of a concealed ducted unit within each room.
The Program of works was a tight 16 weeks but we were able to beat and complete the project within this time scale at 14 weeks.
Contact us today..
Call today for a free quotation on 07812 007 142
